HVAC Design + Build
Location: San Luis Potosi, Mexico
Year: 2017
Systems:
Clean Room ISO 8,
25 ACH, Process Water System,
HVAC System,
Compressed Air System
Installed Capacity:
Air Compressor 75Hp@125psi,
Packaged Units 91Ton,
Air-pak 87.000cfm, HEPA 99.97%,
Process Water
Special Case: Clean room ISO 8 with filter handlers and packaged units.
Gallery

